Monday, October 21st, 2024

Vehicular movement resumes on Karnali Highway


28 August 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

JUMLA: Karnali Highway, which was obstructed due to landslide and flood for the last two days, has been brought back to operation on Wednesday.

Vehicular movement along the highway resumed after the Road Division Office along with the help of locals cleared the landslide from the Highway.

A landslide at Tilagupha municipality-7 along the Kalikot section of the highway had obstructed the road.

Publish Date : 28 August 2019 18:33 PM

No Country for Political Youth

At least 50 percent of Nepal’s population is 25 years

SAFF Women’s Championship: Nepal facing Maldives today

KATHMANDU: The home team, Nepal, is playing their second match

T20 Series against USA: Nepal’s ‘clean sweep’

KATHMANDU: Nepal has achieved a remarkable ‘clean sweep’ in the

Kulekhani-Sisneri road opens

KULEKHANI: Vehicular movement along the Kulekhani-Sisneri road section which connects

Reminiscing last week: A whirlwind of major events

KATHMANDU: The past week has been a whirlwind of significant