Tuesday, December 23rd, 2025

Pipeline and fuel storage project to cost around Rs 41 bln



KATHMANDU: A preliminary investigation has shown that around Rs 41 billion is required for the construction of oil storage and laying pipelines of petroleum products and liquefied petroleum gas (LPG).

A study made by Nepal Oli Corporation (NOC) in collaboration with the Institute of Engineering (IoE), Pulchowk , has said that the estimated cost of six four pipelines and six oil storage will cost Rs 41 billion 144 million ,500 thousand.

NOC, the state oil monopoly,  is planning to built oil storage that will hold 270 thousand kiloliters of petroleum products and 80 thousand metric tons of LPG.

Publish Date : 25 April 2019 07:13 AM

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has published the official foreign

Sandeep Lamichhane leaves for Bangladesh for BPL

KATHMANDU: Nepali leg spinner Sandeep Lamichhane has left for Bangladesh

Election 72 days away: EC spells out PR disqualification criteria

KATHMANDU: With 72 days remaining until the House of Representatives

Perception and falsification of Chinese engagement in Nepal

Chinese Ambassador to Nepal Chen Song is completing his three-year

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of