Sunday, September 8th, 2024

Pipeline and fuel storage project to cost around Rs 41 bln


25 April 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: A preliminary investigation has shown that around Rs 41 billion is required for the construction of oil storage and laying pipelines of petroleum products and liquefied petroleum gas (LPG).

A study made by Nepal Oli Corporation (NOC) in collaboration with the Institute of Engineering (IoE), Pulchowk , has said that the estimated cost of six four pipelines and six oil storage will cost Rs 41 billion 144 million ,500 thousand.

NOC, the state oil monopoly,  is planning to built oil storage that will hold 270 thousand kiloliters of petroleum products and 80 thousand metric tons of LPG.

Publish Date : 25 April 2019 07:13 AM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

No alternative to socialism: Prachanda

KATHMANDU: Chairman of Maoist Center Pushpa Kamal Dahal “Prachanda” has

Sugarcane farming down for lack of grants

KAILALI: The area for cultivating sugarcane, an important cash crop,

Nepal-India issues can be resolved through dialogue: PM

KATHMANDU: Prime Minister KP Oli has voiced his confidence that

PM Oli confers awards on 40 civil servants

KATHMANDU: Prime Minister (PM) KP Oli handed over the Civil