Wednesday, December 25th, 2024

Works of Melamchi Drinking Water Project resume


20 June 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: Works of Melamchi Drinking Water Project has resumed. The drinking water project is one of the national pride projects.

Melamchi Water Supply Development Board (MWSDB) under the Ministry of Water Supply has been doing homework to speed up the construction works of the project.

“Works of fitting ventilation shafts inside the tunnel and works of releasing access water in Bagmati River have started,” said Spokesperson at the Ministry Ritesh Kumar Shakya.

Publish Date : 20 June 2019 18:00 PM

Rapid pesticide residue analysis lab set up in Dhalkebar

KATHMANDU: A rapid pesticide residue analysis laboratory has been inaugurated

Upper Tamakoshi Hydropower resumes partial operation after flood-induced damages

KATHMANDU: The 456-megawatt Upper Tamakoshi Hydropower Project, severely damaged by

Constitutional amendment process to begin after multi-party discussions: DPM Singh

KATHMANDU: Deputy Prime Minister and Urban Development Minister Prakash Man

Reconstruction of Agam Chhen at Hanuman Dhoka Durbar to begin soon

KATHMANDU: The Department of Archaeology has announced plans to reconstruct

Gold and silver prices down marginally

KATHMANDU: The price of gold and silver witnessed a minor