Thursday, March 6th, 2025

Bailey bridge over Bhabsi River along East-West Highway


04 August 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MAHOTTARI: A bailey bridge has been installed over the Bhabsi River along the East-West Highway in Mahottari. As a result, transportation has become regular since last night.

The bridge has been washed away by flash floods triggered by incessant rainfall on July 13. A diversion was being used to cross the river or a 30 km turn had to be taken through the jungle.

The 48.8 bailey bridge was installed to resume traffic since last night, said chief of the Road Division Office, Janakpur Binod Kumar Mauwar.

The bridge has a load-bearing capacity of 98 tons but for now, only one vehicle at a time with a maximum loan of 35 tons is being allowed to ply through it.

 

Publish Date : 04 August 2019 08:25 AM

Opposition heats up parliament over three key issues, including the Kulman case

KATHMANDU: The main opposition, Maoist Center, along with other parties,

Weather to remain clear across most parts of Nepal

KATHMANDU: The Meteorological Forecasting Division has reported that Nepal is

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank has published the exchange rates for

Five ordinances to be presented in National Assembly today

KATHMANDU: The government is set to present five ordinances in