Tuesday, November 19th, 2024

Bailey bridge over Bhabsi River along East-West Highway


04 August 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MAHOTTARI: A bailey bridge has been installed over the Bhabsi River along the East-West Highway in Mahottari. As a result, transportation has become regular since last night.

The bridge has been washed away by flash floods triggered by incessant rainfall on July 13. A diversion was being used to cross the river or a 30 km turn had to be taken through the jungle.

The 48.8 bailey bridge was installed to resume traffic since last night, said chief of the Road Division Office, Janakpur Binod Kumar Mauwar.

The bridge has a load-bearing capacity of 98 tons but for now, only one vehicle at a time with a maximum loan of 35 tons is being allowed to ply through it.

 

Publish Date : 04 August 2019 08:25 AM

Germany to provide Rs 1.46 billion grant to Nepal for power distribution project

KATHMANDU: The Ministry of Finance (MoF), on behalf of Government

PM honours bodybuilding competition winners

KATHMANDU: Prime Minister KP Sharma Oli has honoured the players

Home Minister asks security officials to work in innovative ways

SUDURPASCHIM: Home Minister Ramesh Lekhak has directed the security officials

Cabinet meeting postponed as top leaders of Congress and UML hold talks

KATHMANDU: The Cabinet meeting scheduled for Tuesday evening has been

Health Minister Paudel pledges drug prices will be adjusted within a month

PARBAT: Minister for Health and Population Pradip Paudel has said