Wednesday, January 21st, 2026

Upper Trishuli 3 A to start test transmission Sunday



KATHMANDU: The Upper Trishuli 3 A Hydropower Project is to go for test transmission from Sunday.

According to the Nepal Electricity Authority (NEA), the test transmission would be undertaken along the transmission line from Kispang rural municipality of Nuwakot to Matatirtha of Kathmandu from Sunday.

The NEA has also cautioned people not to go to the periphery of 15-20 meters from the transmission tower during the test operation. In order to avert possible electrical accidents, the NEA has called for the public to adopt safety measures in the stipulated area.

Publish Date : 04 May 2019 22:20 PM

US deports 80 more Nepalis

KATHMANDU: The United States has deported 80 Nepali citizens, who

Oli confident of 70% votes in upcoming election, criticizes political criminalization

JHAPA: CPN-UML Chair and former Prime Minister KP Sharma Oli

Former prime ministers test political relevance amid shifting electoral ground

KATHMANDU: Four former prime ministers have entered the House of

Balen Shah strategizes with all Sunsari RSP candidates in Damak

DAMAK: Rastriya Swatantra Party (RSP) leader Balen Shah convened a