Sunday, December 22nd, 2024

Runway rehabilitation begins at TIA


02 April 2019  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Runway rehabilitation has begun at the Tribhuvan International Airport (TIA) in a full-fledged manner since last night. The Civil Aviation Authority of Nepal (CAAN), which is the regulatory body of aviation sector, has been entrusted for the up-gradation of the runway.

Sitaram Bhandari, Chief at the Air Traffic Controller (ATC), informed that the landing and takeoff of flights have not been disturbed. According to him, a Narrow Body Airbus of Nepal Airlines landed at the TIA this morning while and Jet Airbus took off of its first flight.

Domestic flights are also being operated smoothly from the airport.

The TIA has been closed for 10 hours a day for the next three months from April 1 for rehabilitation. Around 80 meters of the runway have been blacktopped in the first day of renovation, according to Baburam Poudel, Director of Air Transport Capacity Enhancement Project of CAAN.

The TIA would limit its service for 14 hours with the effect of renovation for the next three months.

The airport would remain open from 8.00 am to 10 pm every day during the rehabilitation. Earlier, the TIA was providing service from 6.00 am to 3.00 am.

In the course of rehab, the existing pitch of the runway would be removed and new pitch would be rehabilitated.

The CAAN had signed a Memorandum of Understanding (MoU) with a Chinese Company, China National Agro Technology International Engineering Corporation for up-gradation of runway. The agreement of Rs 3.75 billion was signed with the company for the blacktopping of runway.

Publish Date : 02 April 2019 11:59 AM

Woman arrested with Rs 300,000 in cash and marijuana in Jhapa

JHAPA: A 29-year-old woman has been arrested with four kilograms

Children among at least 13 killed in stampedes in Nigeria

ABUJA, NIGERIA: At least 13 people, including four children, were

Preparations to register case against Rabi Lamichhane in Kaski Court today

POKHARA: A case is set to be registered today in

Muglin-Naubise road section to be closed for 3 hours daily

MUGLIN: The Muglin-Naubise road section will be closed for 3

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of